Home / In Construction / Replacement of 12 Inch RTR Sewer Line at Tanajib RO Plant G82
Re-route of Rtr Sewer Line @ Tanajib Ro Plant
Replacement of 12 Inch RTR Sewer Line at Tanajib RO Plant G82
BRIEF SCOPE:
The scope of this project is to install a new 12” RTR Sewer line in between M.H. 1.2/13 and M.H. 1.2/2 located next to the Backwash Tank D-258 & The RO Complex Building at Tanajib RO plant G82.
The new RTR line will work as a leveling pipe between two sewer system manholes to ensure sewer water is drained properly. The new installation of the RTR line shall retain the reliability of sewer system and as a result will ensure smooth flow through the newly installed line.
GENERAL INFORMATION:
Client: | Saudi Aramco |
Location: | Tanajib RO Plant - G82 |
Contract: | Mid Form Contact |
Started: | 01-05-2022 |