Search
Close this search box.

GSC – CCSD PROJECTS AT CENTRAL OPERATION AREA – KHALID

Ccsd Projects, Dhahran - Khalid

SERVICE AGREEMENT FOR SUB-CONTRACT WORKS UNDER MAIN GS CONTRACTOR {KHALID R. AL-BOUHAIMED CONT}:

BRIEF SCOPE:

The work under this service contact involves execution of various GSO Projects through a Work Order or Release POs within 100 Kilometre radius of the geographical operational area of Dhahran main gate.

Main Scope of Work is to provide supervision, technical services, specialized craftsmen, labours, equipment and tools, materials, vehicles and transportation to perform building trades, facilities, maintenance WORK activities which shall include but not limited to:

  • Major maintenance & repair, Renovation, Alterations or modernization of community residential buildings, offices buildings, and other industrial and non-industrial facilities in Central Community operation area
  • Installation, maintenance, repair and testing of all electrical and electronic systems
  • Fire fighting and Fire protection systems
  • HVAC systems and Ducting
  • Security and Access control systems

Below are some of WOs projects executed in the past;

  • Upgrade Fire Protection system @ Al-Munirah B-132 & 133 in Dhahran (W.O.# 70226416)
  • Upgradation of Toilet @ Al Munirah Building #133 (W.O.# 50079746)
  • Rastanura Chilled water system (W.O.# 50077880)
  • Abqaiq ITC Firefighting work (W.O.# KRB-004-OCTOBER 2018)
  • Wall Tile laying @ Al Munirah 133 Building Toilet Area (15 Toilets) (W.O.# KRB-01-09-JAN-2019)
  • Floor Tile & Wall tile Grouting @ Al Munirah 133 Building Toilet Area (78 Toilets) (W.O.# KRB-00-09-JAN-2019)
  • Demolition of Toilet @ Al Munirah 133 Building (165 toilets) (W.O.# KRB-03-09-JAN-2019)
  • Concrete Surface preparation @ Al Munirah Toilet (230 Toilets) (W.O.# KRB-06-09-JAN-2019)