BRIEF SCOPE:

The scope of work is to upgrade HVAC system in Auditorium and Tower buildings at Ithra, for the following AHU’s but not limited to the following;

  • Civil/Demolition
  • Mechanical - Demolition of pipes / Removal of Existing Cooling Coils and Fan Motors
  • HVAC system - Auditorium AHUs - Auditorium Plant Room (A-K-AHU-402, A-K-AHU-403 and A-K-AHU-406) - Fan Motor Replacement, Cooling Coil Replacement & Chilled water Pipe modification
  • VIP Break - Out room - Level 04 Auditorium - New FCU Installation
  • Control system - Integrate the new control valves, FCUs, fan motors, FFU in the AHUs, VFDs etc. with the existing BMS.
  • Electrical system - Electrical demolition of existing system, new installation
  • Testing & Commissioning

GENERAL INFORMATION:

Client: Saudi Aramco
Location: King Abdulaziz Center for World Culture, Ithra, Dhahran
Contract: Mid Form Contact
Started: 30-05-2021